WebJun 18, 2009 · The City has provided an alternate benching detail that can provide up to 3 feet back in that distance, reducing it to approximately 6 feet total. Regardless, if you have a 5 foot setback and you’re building to it, you will be required to have an engineered shoring design prepared and permitted before you can permit the structure. WebAll benched excavations 20 feet or less in depth shall have a maximum allowable slope of 3/4 to 1 and maximum bench dimensions as follows: SIMPLE BENCH MULTIPLE BENCH 3. All excavations 8 feet or less in …
MODULE 3—EXCAVATION AND TRENCHING
WebSloping and benching the sides of the excavation; Supporting the sides of the excavation; or Placing a shield between the side of the excavation and the work area. What types of protective systems can employers use to protect workers from cave-ins? In many cases the type of protective system needed is well known and simple to use. Webearthwork transition and benching details: eb 08-036: 01/08/09: eb 14-025: 203-03: 1: installation details for granular fill-slope protection ... installation details for reinforced … cannula sizes and colours
SECTION 235 EMBANKMENTS
WebBenching There are two basic types of benching, simple and multiple. The type of soil determines the horizontal to vertical ratio of the benched side. As a general rule, the bottom vertical height of the trench must not exceed 4 ft (1.2 m) for the first bench. Subsequent benches may be up to a maximum of 5 ft (1.5 m) vertical in Type A soil WebCFLHD Earthwork Representation Template Drawings for a visual representation of the earthwork quantities. Earthwork Considerations The earthwork representation of the … WebAug 22, 2012 · Earthwork definition, excavation and piling of earth in connection with an engineering operation. See more. flag football snohomish county