WebName of Work: Improvement Works on Mathanguri-Panbang Road(in between 0-13km in stretches). Sub Head: Construction of L-Drain, Box drain, RCC culvert & widening. a Construction of L-Drain( at 7 to 9km ) in stretches Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 sq.m on plan, anddepth > 300 mm including Webboulder (approved quality stones) soling including filling the voids with approved quality murrum/hard soil including watering and compaction complete as directed at site. Cum …

Part - I - Civil Estimate / BOQ

WebINDEX A TECHNICAL SPECIFICATIONS FOR CIVIL WORK 1 General 4 2 List of Indian Standards. ... STANDARD SPECIFICATION FOR HOUSING PROJECTS -PART I (HOUSES AND APARTMENTS) Standard Specification-Ministry of Housing-Kingdom of Bahrain Standard Specification-Ministry of Housing-Kingdom of Bahrain. WebCustomer focussed & Entrepreneurially minded Sales & Business Development Leader specialising in specification and technical sales. An outside of the box thinker, problem solver & skilled communicator, passionate about fostering positive relationships with stakeholders through professional, personable & efficient service for … rc chem https://b-vibe.com

SCOPE OF WORK & SPECIFICATIONS - mazagondock.in

WebThe work to be executed under this Specification consists of excavation for foundations, construction of footing, placement of rock walls, backfill and subsurface drainage to the wall as shown on the Drawings. Requirements for quality control and testing, including maximum lot sizes and minimum test frequencies, WebJan 26, 2024 · Once the Earthwork Excavation work is completed for footing, next immediate permanent work to be done is Boulder (stone) Soling. Fig 4.1: Boulder Soling for Isolated Footing. But before this the bed on which boulder soling is to be laid shall be cleared of all loose materials, levelled,watered and compacted and got approved by the Engineer ... http://dudbc.gov.np/uploads/default/files/945fbff43121355eead2401e84446cb5.pdf rcchemsupply.com review

TECHNICAL SPECIFICATIONS FOR CIVIL WORKS - United Nations …

Category:List of important IS Codes related to bricks

Tags:Soling work specification

Soling work specification

Rubble (boulder) soling procedure for the foundation and …

WebHard Core / Soling Under Floors / Foundations. The work covered under this specification includes all type of soling work either by bricks or by rubble stones laid under floors / … Webinstallation and provisioning etc. The work is to be completed as per manufacturer’s specification . 110 SqM 1000 110000 2 Partitions : i) Rate to be included of all kinds of …

Soling work specification

Did you know?

Websatisfaction of the Engineer. The completed work shall be true to line and level and grade as indicated on the Drawings. Interstices between brick edging and adjacent paving or soling shall be filled by brushing in sand until voids are filled; the edging shall then be sprinkled with water. 3.13.5 Single Layer Brick Flat Soling 3.13.5.1 Description. http://bmsicl.gov.in/uploads/BOQ%20Patna%20MO%20&%20NURSE.pdf

WebA SPECIFICATION FOR CIVIL WORK 1. EARTH WORK 1.1. SCOPE OF WORK: The scope of work covered under this specifications pertains to excavation of foundations, trenches, pits and over areas, in all sorts of soils, soft and hard rock, correct to dimensions given in the drawing including shoring, protections of existing http://rpcl.portal.gov.bd/sites/default/files/files/rpcl.portal.gov.bd/page/75600d9f_2c02_4563_9b3d_9cdcff0b27c5/Community%20lot%201.pdf

Webfor proper completion of work, finished to required templete as directed by Engineer-in-charge but excluding cost of metal required for rectification of the subgrade. 11 773b same as item no 773(a) but in 1:1.5:3 Cum 7876.00 D:\Office Work\Website\upload\SOR\Azamgarh Circle SOR.xlsRoad WorktChap20m Web1. Brick Flat Soling. 2. Rubble soling. 1. Brick Flat Soling. The process of hand packing the bricks over the earth surface or on the sand bed is called as Brick flat soling. In this type of soling, Bricks are arranged adjacent to each other to give a flat surface for concrete work. These are usually done in foundation and ground level.

WebFeb 2, 2024 · With the following methods, plain cement concrete is formed. The Thickness of PCC: The thickness of PCC is normally 50mm over Brick Flat Soling (BFS). If you don’t use BFS below PCC then the ...

WebE & P Department , Gresham House-2 1.0 SCOPE The work covered under this specification includes all type of soling work either by rubble stones laid under floors / hard core under foundations, hand packed, complete as per under mentioned specification and applicable drawings. 2.0 RUBBLE STONE SOLING 2.1 The rubble stone shall be of best variety of … rcch employee portalWebnominal size) including water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. R2-CS-CW-2-a-1 Providing and laying in position ready mixed plain cement concrete, using fly ash and cement content as per approved design mix from Engineer-in-charge rcc hematuriaWebconnections, scaffolds, ladders, working platforms, gangway, mixing of bituminous materials, electric and gas welding, use of hoisting and construction machinery ... before starting earthwork for the basement or as per the specification. It shall be removed as directed after all the items for which it is required are completed ... rcch healthcare benefits portalWebWork Group A : Site Clearance and Protection Works Rate Analysis Work Group B : Excavation and Backfilling Rate Analysis. C Items Page No. Unit ... 5 Flat Brick soling 11 NRs. sqm 6 Stone soling 11 NRs. sqm E Items Page No. Unit 1 Providing, mixing and laying P.C.C. in 1:2:4 ratio 12 NRs. cum rc chemicals canadaWebpropping etc. and removal of form work for:Foundations, footings, bases for columns 4176 Sqmt 9 15 mm cement plaster finished with a floating coat of neat cement of mix: 1:3 (1 cement : 3 coarse sand) 508 sqm 10 Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and ... rcchemsupply.com reddithttp://www.nra.gov.np/uploads/docs/JZix67hE8G210221045015.pdf sims 4 nifty knitting packWebFoundation Soling, Rubble Soling, foundation treatment, weak strata remedy, boulder, soling below footing or foundation, plum concrete, soling to black cotto... sims4 nightcrawler af hair impulse